I am looking for a production manager for the coatings impregnation plant in Terrell, Texas. I would like to be supported as production manager in the coating and waterproofing plants in terrell TX by an experienced professional with over 20 years of experience.
Carlisle Construction Materials (CCM) is a leading manufacturer of waterproofing and coatings for construction and industrial applications. CCW offers a wide range of products and services for the construction, industrial and commercial markets. In addition, the CCW network is supported by over 50 manufacturer representatives, led by regional sales offices across the country.
The production manager is responsible for monitoring the production line and assisting with improvement projects to reduce operating costs. The production manager has the responsibility to monitor and support the improvement of the line, as well as to help with improvements and projects, while reducing operating costs.
Let all activities connected with the production department be managed, including the planning of suitable personnel to operate and operate the line. Coordinate and direct all activities related to the operation, maintenance, repair and maintenance of production lines. Direct and coordinated cooperation of all activities connected with the production departments, which include planning, planning, training, staffing, maintenance of the plants and planning of adequate personnel for the operation and operation of the plants, as well as the management of equipment and equipment for modernization.
Create a training plan for each production position and ensure that employees are adequately trained for the position to which they are assigned. Create a training plan for all production lines and ensure that all employees are properly trained for the position assigned to the employee, as well as develop and train training plans for all production lines. Ensure that each employee has been properly trained for the position assigned to them.
High School Diploma or equivalent, at least 18 years old and member of the Texas State Employees Association (TSEA). Maintenance and maintenance according to specifications serve as safety academy and site requirementsMinimum rate to produce product without rejects. Maintenance and installment production of products without scrap, according to service specifications as the safety champions and site requirements minimum. School leaving certificates or equivalent must be at least 19 years old, with an equivalent school leaving certificate.

We want you to benefit from our career and will do everything in our power to develop you professionally. One of our certified basement waterproofing specialists will be sent to your home to inspect the foundations of the house thoroughly. We want your career to benefit from ours and we will work as many hours as possible for you as long as you want, while developing you professionally.
Apply CCW MiraCLAY sealant to all construction joints, strip the double roofing and install CCWMiraDRAIN Drainage Composite. We cannot do this without the help of our certified basement waterproofing specialists, so please contact us for more information.
The installation of CCW MiraCLAY covers all concrete slabs in the basement and the outer walls of the building. The concrete slab must be at least 4 inches reinforced and a maximum of 6 inches of aggregate material (not reinforced). The non-shrinking cement-like joint fills all aggregate containers that exceed or have honeycombs, voids or pockets of aggregates. Grout on concrete with a smooth and uniform surface fills the space between the concrete surface and the surface of any other surface, such as walls, floors, ceilings and walls.
The membrane must be fastened once with a 305 mm seam to prevent blouse-to-blouse contact between the membrane and concrete slabs in the basement and on the outer walls of the building. The membrane must be fastened once in 12 inches, without seams and a maximum of 1.5 inches from the surface of each concrete slab to the floor, preventing blousings to a depth of at least 2 inches and no more than 3 inches.
The membrane must be fastened once in 12 inches without seams and a maximum of 1.5 inches from the surface of each concrete slab to the floor, preventing blousings to a depth of at least 2 inches and no more than 3 inches. The geotextile (bentonitton) waterproofing membrane is covered with polyethylene film when rain is imminent or when backfilling is not immediate and when necessary to prevent contact between the membrane and concrete slabs in the basement and on the exterior walls of the building. To fix it on substrate and extend it in any kind, must be used in conjunction with a washer.
Starting at the bottom of the wall, roll out the CCW MiraCLAY nail polish on the top plate and install a taped piece of it on a soldier's beam to lengthen it to a depth of 1.5 inches and no more than 3 inches.
The backfill material is not contaminated with salt or other material that could prevent the moisture from the CCW MiraCLAY. Ensure that the product section is delivered to all affected trades at any time to avoid interruptions in construction progress. Water samples of 2 litres are required if the project has groundwater and must be submitted to the waterproofing manufacturer to check contamination and compatibility with the waterproofing membrane. The waterproof membrane extends 152 mm across the grade with a minimum end bar and constant compression is maintained by a high pressure water pressure of 1,000 pounds per square inch.